Beloit, WI

Ballard Engineering installed a 3,000KW distributed power/cogeneration system at Beloit Memorial Hospital in Beloit, Wisconsin. The system provides maximum flexibility to both the hospital and local utility company in regards to electricity, heating, air conditioning, and hot water usage.

Additional Material